Greensboro, NC
Home MenuInfrastructure, Construction Plan Review
~ Engineering Plan Review - construction drawing review for water, sewer, and roadways
~ Right-of-Way Encroachment Permit General Guidelines
~ Public Improvements Bonding Procedures
~ Infrastructure Information Security Policy
~ Water and Sewer Line Construction Standard Specifications - click here for related water/wastewater/stormwater requirements
~ Standards for Water, Sewer, and Sewage Lift Station Design - click here for related water/wastewater/stormwater requirements
~ Standard Roadway and Utility Drawings
~ Backflow Installation Drawings - click here for backflow prevention information
~ Developer's Operational Agreement - click here for related water/wastewater/stormwater requirements
~ Home/Property Owner's Operational Agreement - click here for related water/wastewater/stormwater requirements
~ Stormwater Best Management Practices
~ If Proposed work requires an easement release (Planning Board action)
- Application and Fee
- Process Flowchart
~ If required work relies on a modification of LDO standards
- Type 1 General
- Type 1 Build-to Line
- Type 2
- Type 3
~ If proposed site or building work is within in a local historic district
- Historic District Program
- FAQs
- Certificate of Appropriateness Application - click here for application instructions
~ If proposed work is within a Special Overlay District
- Districts, plans, and manuals
~ If proposed work requires Board of Adjustment (BOA) consideration
- Fee Schedule, BOA meeting calendar, Process Flowchart
- Applications for variance, interpretation, appeal and special exception
- BOA Rules and Regulations Manual
~ If proposed work requires a change in the zoning of the site or other Zoning Commission review
- Fee Schedule, Zoning Commission meeting calendar, Process Flowchart
- Application for Special Use Permit Application (heard by Zoning Commission), Rezoning (heard by Zoning Commission and possibly City Council), and Comprehensive Plan Amendment